Our mission was to execute an extraordinary maintenance works to bring the building back to life. The work included the total reconstruction of the damaged walls and roof, the total renovation of the unit, the Remaking of the electrical system, the air-conditioning system fire safety and the restoration of services in all plans and their sewer and water systems. Also the scope of work included the installation of windows doors and gypsum board partitions .
In this project, time was our top priority we had to run the clock to finish this project in less than 45 days which have done successfully .
We have successfully accomplished our mission on time, not only that we went beyond that, we had a believe that maintenance is not enough and as a part of our civic duty we chose to design and execute the interior of the building.